Meter Resets

Meter resets are required on any property which has been without electrical power for six months or more. If a meter reset is required, a City of Wichita Electrical Inspector will have to inspect the property and find it to be in a safe condition before sending the release to Westar Energy. If the City Inspector finds that the property's electrical system is unsafe, a City Licensed Electrical Contractor is required to make the repairs/corrections and call for re-inspection to get
the power turned on.  Please DO NOT do any of the electrical work yourself. Eastside Electric only calls for inspection of work performed by EASTSIDE ELECTRIC!  No Exceptions.

We are very familiar with the meter reset process and passed dozens of meter reset inspections in 2006.  So if you have a failed inspection and need to get your power on ASAP, please give us a call at 214-1101.  Quality work, fair prices, and passed inspections are what we provide.  Here's a form which the City of Wichita uses to determine if you pass or fail your electrical inspection.

© 2007 Eastside Electric Company, LLC. All rights reserved.  Site designed by n.gen.uity.